Installing the Floor, Roof and Walls: Days 2 and 3

Posted on: October 30th, 2014 by Barley Store

 
Day two of the prefabricated installation went rapidly. The third and the fourth stories were assembled, the riggers doing a fantastic job to get all the pieces up there by crane safely and in one piece.
 
On the final day of the assembly the third story and rooftop went up, completing the assembly process. The final piece was the wooden beams that create the ‘roof’ of the rooftop hot-tub.
 


 
To watch the whole time-lapse video see subsequent posts or head to our YouTube channel at Barley Store.
 

Leave a Reply