Archive for the ‘Transport’ Category

Interview with Ralph Alphonso – The Month of October 2014

Posted on: October 31st, 2014 by Barley Store

 
With a lot going on, Ralph runs through the busy month of October. The progress is impressive, from a site of foundations to a fully constructed building! One of the many perks of prefabricating wall, floor and roof cassettes!
 

 
For more video interviews head to our YouTube channel BarleyStore for the full Construction Diary Interviews playlist.
 

Video Diary: Floor and Wall Panels Construction

Posted on: October 31st, 2014 by Barley Store

 
In just three days we had the whole 5×4 structure up, with everyone working in sequence to make sure it was a smooth process. See the video below of all three days, or head to our YouTube channel BarleyStore for the full 5×4 Hayes Lane Project playlist.

Installing the Floor, Roof and Walls: Days 2 and 3

Posted on: October 30th, 2014 by Barley Store

 
Day two of the prefabricated installation went rapidly. The third and the fourth stories were assembled, the riggers doing a fantastic job to get all the pieces up there by crane safely and in one piece.
 
On the final day of the assembly the third story and rooftop went up, completing the assembly process. The final piece was the wooden beams that create the ‘roof’ of the rooftop hot-tub.
 


 
To watch the whole time-lapse video see subsequent posts or head to our YouTube channel at Barley Store.